Beginner
150 hoursAir, refrigerant awareness, electrical safety, and the first honest diagnosis.
- — Heat transfer
- — EPA awareness
- — Electrical safety
- — Filters and airflow
- — Basic recovery ethics
Test required to unlock the next level
HVAC
Six hundred hours from first diagnosis to commissioning. Tests gate every step of the ladder.
Air, refrigerant awareness, electrical safety, and the first honest diagnosis.
Test required to unlock the next level
Charging, airflow, controls, and residential equipment that actually holds a setpoint.
Test required to unlock the next level
Commercial RTUs, economizers, inverters, and diagnosis that does not guess.
Test required to unlock the next level
Design, commissioning, and leading crews through buildings that cannot go down.
Test required to unlock the next level